993 Transmission Line Upgrade

Carn Construction has been involved in the delivery of many major infrastructure projects nationwide and has the capacity to work on projects throughout Australia. Recent major clients include Downer EDI, John Holland Group, Barclay Mowlem, United Group Limited, Balfour Beatty, Transgrid, Powerlink, Western Power, BHP, Rio Tinto and many more. Testimonial to this can be seen in the completed projects list below.
Yarrawonga Power Station (VIC)
Formwork, Steel Fixing & Concrete Works
1995 – Ballina Water Treatment Plant (NSW)
Formwork, Steel Fixing & Concrete Works
1995-96 – Kwinana to Kemerton 330kV Transmission Line (WA)
Foundation Installation Works, Tower Assembly & Erection
1996 – Port Augusta to Olympic Dam 275kV Transmission Line (SA)
Foundation Installation Works
BHP Port Hedland Sub-station (WA)
Transformer Bays and Foundation Works
Shovelanna Sub-station (WA)
Bored Foundations (Poles) and Construction of Sub-station
Lismore Sub-station (NSW)
Formwork, Steel Fixing & Concrete Works
Portland Sub-station (VIC)
Formwork, Steel Fixing & Concrete Works
Bunbury to Wagerup Alcoa Transmission Line Project (WA)
Erection of Steel Poles
QLD to NSW Interlink 275kV Transmission Line (QLD)
Bored, Mass & Piled Foundations
Lexia Ground Water Treatment Plant (WA)
Field Pipe Erection
2002 – PTR Transmission Line Project (QLD)
Bored & Mass Foundation Works
2002 – SA Multiple Sub-station Upgrade Works (SA)
Formwork, Steel Fixing & Concrete Works
2001-02 – Springmount to Chalumbin 275kV Transmission Line (QLD)
Bored, Mass & Piled Foundations
Tomago 330kV Switching Station (NSW)
Formwork, Steel Fixing & Concrete Works
South Windsor Sewerage Treatment Plant (NSW)
Formwork, Steel Fixing & Concrete Works
Penrith Sewerage Treatment Plant (NSW)
Formwork, Steel Fixing & Concrete Works
2006 – Coffs Harbour Sub-station Transmission Line Diversion (NSW)
Mass Foundations
2005 – Middle Ridge to Greenbank 275kV Transmission Line (QLD)
Bored & Mass Foundations (Poles)
2005 – Dubbo Water Treatment Plant (NSW)
Formwork, Steel Fixing & Concrete Works
2005 – Emigrant Creek Water Treatment Plant (NSW)
Formwork, Steel Fixing & Concrete Works
2005 – Milton Ulladulla Sewerage Treatment Plant (NSW)
Formwork, Steel Fixing & Concrete Works
2004-06 – Yass N003 Sub-station Reconstruction Project (NSW)
Transformer Slabs & Foundations
2004 – Waratah 330kV Sub-station (NSW)
Formwork, Steel Fixing & Concrete Works
2004 – Millmerran to Middle Ridge 275kV Transmission Line (QLD)
Bored Foundations (Poles), Tower Assembly
2009 – Wollar Sub-station (NSW)
Transformer Slabs, Foundations & Control Building
2009 – Pioneer Valley to Glenella 132kV Transmission Line (QLD)
Bored & Mass Foundations (Poles), Pole Assembly & Erection
2009 – Southpine to Sandgate 275kV Transmission Line (QLD)
Bored & Mass Foundations
2008 – Shotts to Wells 330kV Transmission Line (WA)
Bored & Mass Foundations
2008 – Hope Downs 220kV Transmission Line (WA)
Bored & Mass Foundations
2007-09 – Innisfail to Edmonton 132/275kV Transmission Line (QLD)
Bored, Mass & Screw Pile Foundations, Line Assembly & Erection
2007 – Tee Bar Creek Sub-station (WA)
Transformer Slabs & Foundations
2007 – Lilyvale to Blackwater 132kV Transmission Line (QLD)
Bored & Mass Foundations (Poles)
2007 – Nebo to Pioneer Valley 132kV Transmission Line (QLD)
Bored & Mass Foundations
2012 – Ingham to Tully 132/275kV Transmission Line (QLD)
Micro Piles & Bored Foundations
2011-12 – 7 Mile to Cape Lambert Transmission Line (WA)
Rock Anchors, Mass & Bored Foundations
2011 – Capital Wind Farm Project Bungedore (NSW)
Communication Tower Foundation Works
2010-11 – Western Downs to Halys 275kV Transmission Line (QLD)
Bored & Mass Foundations
2010 – Yabulu to Ingham 132/275kV Transmission Line (QLD)
Screw Piles, CFA & Bored Foundations
BBUGL, Ingham to Cardwell 132/275kV Transmission Line (QLD)
Micro Piles & Bored Foundations
John Holland Pty Ltd, Western Downs South – Columboola Power Transmission Line Project (QLD)
Mass & Bored Foundations
Downer EDI Engineering Power Pty Limited, Design and Construct 330kV Double Circuit Transmission Line Pinjar – Eneabba (WA)
Access, Mass, CFA and Bored Foundations.
Tomago to Stroud 132/330kV Transmission Line (NSW)
Concrete Poles, Guyed Anchors, Bored & Mass Foundations, Pole Erection