Carn Construction has been involved in the delivery of many major infrastructure projects nationwide and has the capacity to work on projects throughout Australia. Recent major clients include Downer EDI, John Holland Group, Barclay Mowlem, United Group Limited, Balfour Beatty, Transgrid, Powerlink, Western Power, BHP, Rio Tinto and many more. Testimonial to this can be seen in the completed projects list below.

RECENT PROJECTS

  • /
  • /
  • /
  • /

PAST PROJECTS

Yarrawonga Power Station (VIC)
Formwork, Steel Fixing & Concrete Works

1995 – Ballina Water Treatment Plant (NSW)
Formwork, Steel Fixing & Concrete Works

1995-96 – Kwinana to Kemerton 330kV Transmission Line (WA)
Foundation Installation Works, Tower Assembly & Erection

1996 – Port Augusta to Olympic Dam 275kV Transmission Line (SA)
Foundation Installation Works

BHP Port Hedland Sub-station (WA)
Transformer Bays and Foundation Works

Shovelanna Sub-station (WA)
Bored Foundations (Poles) and Construction of Sub-station

Lismore Sub-station (NSW)
Formwork, Steel Fixing & Concrete Works

Portland Sub-station (VIC)
Formwork, Steel Fixing & Concrete Works

Bunbury to Wagerup Alcoa Transmission Line Project (WA)
Erection of Steel Poles

QLD to NSW Interlink 275kV Transmission Line (QLD)
Bored, Mass & Piled Foundations

Lexia Ground Water Treatment Plant (WA)
Field Pipe Erection

2002 – PTR Transmission Line Project (QLD)
Bored & Mass Foundation Works

2002 – SA Multiple Sub-station Upgrade Works (SA)
Formwork, Steel Fixing & Concrete Works

2001-02 – Springmount to Chalumbin 275kV Transmission Line (QLD)
Bored, Mass & Piled Foundations

Tomago 330kV Switching Station (NSW)
Formwork, Steel Fixing & Concrete Works

South Windsor Sewerage Treatment Plant (NSW)
Formwork, Steel Fixing & Concrete Works

Penrith Sewerage Treatment Plant (NSW)
Formwork, Steel Fixing & Concrete Works

2006 – Coffs Harbour Sub-station Transmission Line Diversion (NSW)
Mass Foundations

2005 – Middle Ridge to Greenbank 275kV Transmission Line (QLD)
Bored & Mass Foundations (Poles)

2005 – Dubbo Water Treatment Plant (NSW)
Formwork, Steel Fixing & Concrete Works

2005 – Emigrant Creek Water Treatment Plant (NSW)
Formwork, Steel Fixing & Concrete Works

2005 – Milton Ulladulla Sewerage Treatment Plant (NSW)
Formwork, Steel Fixing & Concrete Works

2004-06 – Yass N003 Sub-station Reconstruction Project (NSW)
Transformer Slabs & Foundations

2004 – Waratah 330kV Sub-station (NSW)
Formwork, Steel Fixing & Concrete Works

2004 – Millmerran to Middle Ridge 275kV Transmission Line (QLD)
Bored Foundations (Poles), Tower Assembly

2009 – Wollar Sub-station (NSW)
Transformer Slabs, Foundations & Control Building

2009 – Pioneer Valley to Glenella 132kV Transmission Line (QLD)
Bored & Mass Foundations (Poles), Pole Assembly & Erection

2009 – Southpine to Sandgate 275kV Transmission Line (QLD)
Bored & Mass Foundations

2008 – Shotts to Wells 330kV Transmission Line (WA)
Bored & Mass Foundations

2008 – Hope Downs 220kV Transmission Line (WA)
Bored & Mass Foundations

2007-09 – Innisfail to Edmonton 132/275kV Transmission Line (QLD)
Bored, Mass & Screw Pile Foundations, Line Assembly & Erection

2007 – Tee Bar Creek Sub-station (WA)
Transformer Slabs & Foundations

2007 – Lilyvale to Blackwater 132kV Transmission Line (QLD)
Bored & Mass Foundations (Poles)

2007 – Nebo to Pioneer Valley 132kV Transmission Line (QLD)
Bored & Mass Foundations

2012 – Ingham to Tully 132/275kV Transmission Line (QLD)
Micro Piles & Bored Foundations

2011-12 – 7 Mile to Cape Lambert Transmission Line (WA)
Rock Anchors, Mass & Bored Foundations

2011 – Capital Wind Farm Project Bungedore  (NSW)
Communication Tower Foundation Works

2010-11 – Western Downs to Halys 275kV Transmission Line (QLD)
Bored & Mass Foundations

2010 – Yabulu to Ingham 132/275kV Transmission Line (QLD)
Screw Piles, CFA & Bored Foundations

BBUGL, Ingham to Cardwell 132/275kV Transmission Line (QLD)
Micro Piles & Bored Foundations

John Holland Pty Ltd, Western Downs South – Columboola Power Transmission Line Project (QLD)
Mass & Bored Foundations

Downer EDI Engineering Power Pty Limited, Design and Construct 330kV Double Circuit Transmission Line Pinjar – Eneabba (WA)
Access, Mass, CFA and Bored Foundations.

Tomago to Stroud 132/330kV Transmission Line (NSW)
Concrete Poles, Guyed Anchors, Bored & Mass Foundations, Pole Erection